Red team report: what it must contain, with a template
Open the scoping sheetSee the frameworks table
The attack, red side
Actions on target: gain further access and reach the objective.
Download the templates
- DOCXScoping sheet, Word50 questions, blank answer column, landscape, 10 KB
- CSVScoping sheet, CSV50 rows with why each matters and its source
- JSONScoping sheet, JSON50 rows, edition and license in the file
Free to reuse under CC BY 4.0. Open the scoping sheet to print it.
What should a red team report contain?
It should contain the attack story and the findings. TIBER-EU requires: the targeted functions and systems; a summary of each scenario; flags reached and not reached; attack paths followed successfully and unsuccessfully; techniques used successfully and unsuccessfully; deviations from the plan; and leg-ups granted.
It also needs the blue team actions the testers are aware of, stealth techniques used and whether detection was adequate, findings categorized by NIST function, criticality and complexity, a provisional root cause analysis, and recommendations for remediation.
Is a red team test a pass or fail?
No. The ECB says a TIBER-EU test does not produce a pass or fail but an insight into strengths and weaknesses and a focus on learning. The report is written to feed the replay, the purple session and the remediation plan.
A reader who wants a score should note that the sources read do not define one.
Who is the report for?
Several readers, so it has layers. TIBER-EU asks for a short narrative in lay terms for senior management and governance bodies, covering what was tested, a high-level timeline, the main findings, categories of recommendations and any significant exceptions. A storyline per scenario, in line with MITRE ATT&CK, is for the staff of the tested entity.
What does a red team report template look like?
Use the outline below, based on the TIBER-EU required content. Fields can be adjusted to your scheme.
| Section | Fields |
|---|---|
| 1. Management summary | Functions and systems tested; timeline; scenarios; main findings; recommendation categories; exceptions. |
| 2. Scope and plan | Functions, systems, flags, deviations from the plan, leg-ups with date and reason. |
| 3. Storyline per scenario | Simulated actor; in, through and out phases; techniques mapped to MITRE ATT&CK; flags reached and not reached. |
| 4. Attack paths and detection | Successful and unsuccessful paths with techniques; stealth techniques used; whether the entity's detection capability was adequate and, if not, what to improve; the threat actor sophistication actually needed. |
| 5. Blue team actions | Defender actions the testers are aware of, with a timeline and logs the blue team can use for its own report. |
| 6. Findings | For each: category by NIST function (Identify, Protect, Detect, Respond, Recover), criticality and complexity, how the entity was compromised and the impact. |
| 7. Provisional root causes | Root causes across people, process and technology, rated by criticality, and what further attack was possible with more time. |
| 8. Recommendations | Concrete remediations tied to findings, with a priority. |
How soon is the report due?
Under the EU technical standards the testers deliver the red team test report to the control team within 4 weeks of the end of active testing. CBEST says a draft penetration test report should be issued within a period agreed with the regulator, generally no later than two weeks after testing.
Related pages
- Blue team report template and what it must contain
- Red team example: the CISA red team assessment of 2022
- Red team debrief: how to turn findings into fixes
- Red team engagement scoping sheet: 50 questions to answer before testing
- Red team process: the phases of an engagement
- Flag, defined
- Assumed breach red team: starting from inside
Sources
- European Central Bank, TIBER-EU Red Team Test Report Guidance, 2025, read 16 November 2026
- European Central Bank, What is TIBER-EU?, read 16 November 2026
- EUR-Lex, Commission Delegated Regulation (EU) 2025/1190 (TLPT technical standards), read 16 November 2026
- Bank of England, CBEST Implementation Guide, 2024 edition, read 16 November 2026
- Association of Banks in Singapore, Red Team: Adversarial Attack Simulation Exercise Guidelines, September 2024, read 16 November 2026
Last reviewed 16 November 2026.